VIEW FULL VERSION: Link
Title: Over 1/2 done
Category: Other
Blog Entry: Leo has been working hard on the convertible top. It is a little frustrationg so he walks away from it to cool off. The major part is next. Stapling the front on the top. I'm so nervous I could vomit. Still need to plop the well liner in.We have the speedometer out of the LX. Need to change a few bulbs. Cant deside if we are going to put the new cable in or not. Leo tested everything and it seems to be working fine. There is one more thing he needs to look at before he desides to replace the cable.I can't wait till all the mechanical stuff is done on the cars. Then it will be paint time. Both cars need a new paint job.