View Single Post
  Digg! #9 (permalink)  
Old 04-10-2009, 06:49 AM
jthorn9's Avatar
jthorn9 jthorn9 is offline
Super Moderator
 

Join Date: Dec 2007
Posts: 378
Default

Well that will work, but plan on having your car down for about 20 hours to do the heads and intake swap. It really doesn't take that long to do, but due to lag time in finding bolts, taking breaks for stretches, and getting some pain in the ass nuts out the way, not to mention the trips to the store the get certain tools you'll need will eat up your time to do the heads and intake.
__________________
Trinity 99 Mustang SVT Cobra 280 rwhp, 290 rwtq
Selena 95 Mustang SVO GT-40 250 rwhp, 275 rwtq (Under Reconstruction)
00 Mustang V6 (sold)
98 Mustang V6 (sold)
Reply With Quote

Sponsored Links