Most of it's already done, but quite a bit I guess.
1. Rebuild motor (new pistons/overbore.......don'tknow what final size will be.......bigger than 418, for sure tho).
2. Have motor dyno'd (this time with the juice too). :>)
3. Went thru trans. (basic freshen up/ck over).
4. New torque converter (got an Ultimate nitrous converter).
5. Rebuild rear end.swap gears out from 4.33s to 4.10s.
6. Re=shoe the brakes. Installed final braided line in rear. Removed ford proportioning valve.
7. Install funny car cage to existing 12 point.
8. Install parachute mount/parachute.
9. Install 2 all new fuel systems. (one for fuel, one for nitrous).
10. Install new gauges for monitoring new nitrous setup.
11. Rewired a bunch of the car.
12. Polished all the rims.
13. Rebalanced all the tires.
14. Did alot of detail work on body. (needed it).
15. Had some 'iffy' spots weldedup/reinforced on ladder mounts.
16. Had my safety pajamas cleaned.......:>)
17. Bought a nice 'wilson' nitrous plate, and jets setup.
Still a lot of 'little things' to do..
Damm it's still going to be a long azz winter................................
